Electric Construction Elevator VFD Speed Control Rack and Pinion Hoist 2 Ton

Electric Construction Elevator VFD Speed Control Rack and Pinion Hoist 2 Ton

Electric Construction Elevator VFD Speed Control Rack and Pinion Hoist 2 Ton Introduction:

The electric construction elevator is a rack and pinion hoist designed for vertical lifting of materials and personnel on building sites. Equipped with a VFD speed control system, it allows smooth starting, stopping, and adjustable lifting speed to improve operating safety and efficiency. With a 2-ton rated lifting capacity, the hoist is suitable for mid- to high-rise construction projects requiring stable and continuous vertical transport.

construction passenger hoist projects

SC200/200 GJJ Passenger hoist specification:

ModelRated Load(kg)Lifting SpeedSafety deviceMotor power (kw)Invert power (kw)
SC200/2002*20000~36m/minSAJ40-1.22*3*112*37
2*20000~40m/minSAJ40-1.22*2*112*37
2*20000~53m/minSAJ50-1.42*2*132*45
2*20000~63m/minSAJ50-1.42*3*112*75
2*20000~96m/minSAJ50-2.02*3*18.52*110
SC20020000~36m/minSAJ40-1.23*1137
20000~40m/minSAJ40-1.22*1137
20000~53m/minSAJ50-1.42*1345
20000~63m/minSAJ50-1.43*1175
20000~96m/minSAJ50-2.03*18.5110

Passenger Hoist Parts Introduction:

The passenger hoist parts include a cable Protection Ring, windproof strip, power cable, construction hoist motor, worm and gear reducer, adjustment unit, mast section, cage, calling system, overload protector,anti-fall safety device, brake piece for building hoist, sliding contact line, controller, Back Roller, worm wheel, master switch, passenger hoist rope pulley and so on. 

construction passenger hoist Spare Parts

If you are interested in our products, or plan to import SC series construction elevator hoist and other construction products, please feel free to contact us. Looking forward to long-term cooperation with you.

passenger hoist package and shipping GOHIGHER suspended platform construction hoist tower crane