Tower Crane Parts Foundation Fixing Angle Embedded Outriggers Leg
PRODUCTS CATEGORY
Tower Crane Parts Foundation Fixing Angle Embedded Outriggers Leg Description:
Tower Crane Foundation Fixing Angle Embedded Outriggers Leg. It is an important component in tower crane construction. The angle embedded outriggers leg is designed to provide stable support for the tower crane foundation. It is carefully fixed to ensure the safety and stability of the crane during operation, playing a crucial role in bearing the weight and maintaining balance. Its proper installation is essential for the smooth functioning of the tower crane in construction projects.

Tower Crane Foundation Fixing Angle Embedded Outriggers Leg Specification:
| Model Number | Pin Size(mm) | Fixing Angle Size(m) | Weight(KG) | Style |
| L46A1 | D50 | 0.5*0.5*0.5*1.14 | 660 | disposable |
| Zoomlion 7035 | D50 | 0.5*0.5*0.5*2.15 | 1640 | disposable |
| LIEBHERR180HC/256HC/290HC | Bolt Size: M45*440 | 0.35*0.35*1.4 | 860 | disposable |
| L68A1/L68B1/L68B2 | D65 | 06*0.6*1.25 | 1050 | disposable |
| MD1.6M | D50 | 0.56*0.56*0.52 | 700 | reusable |
| L46A1 | D50 | 0.5*0.5*0.69 | 880 | reusable |
Tower Crane Accessories Introduction:
In addition to Fixing Angle for Tower Crane, the tower crane parts also include Steel Structure Parts,Adjust Transition Mast Section,tower crane anchor frame,tower crane mast section ladder,tower crane joystick controller,horizontal jib,Motor and parts,GearboX and spare parts,Slewing Bearing Or Drum,Control Panel,Limited Switch Or Resistance Box,Slewing Coupling Pulley Or Wire Rope,Electrical Parts,Pulley Or Encoder,Carbon Brush Or Brake Disc,Mechanism Drum and Slewing Bearing,Control Panel and Resistance Box,Limited Switch And Wire Rope,Cabin And Slewing Block,Safety Parts And Joystick and so on.

About Us
GOHIGHER is professional machinery and equipment manufacturer & supplier, have more than 20 years export experience.Main products are the Standard model suspended access platforms (zlp250,zlp500,zlp630,zlp800,zlp1000),and custom suspended access cradles, SC100/100,SC200/200 construction passenger and material hoist,topkit tower crane,topless tower crane,luffing tower crane and spare parts.

If you are interested in our products, or plan to import Tower Crane Fixing Angle Embedded Outriggers Leg and other construction products, please feel free to contact us. Looking forward to long-term cooperation with you.














